Sr. No. | Name of Projects | State | Authority |
---|---|---|---|
1 | Construction of Bridge and its approaches A/C Wainganga river in km 491/00 of Nagpur- Raipur road section of N.H.6 in Bhandara District under B.O.T scheme with toll rights (JAIPL) | Madhya Pradesh | MORTH |
2 | Six laning of Belgaum – Dharwad section of NH-4 from km 433.00 to km 515.00 (Length – 79.36 Km) in the state of Karnataka to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase – V (Package No.: NHDP – V/MC-II/19). | Karnataka | NHAI |
3 | Four laning of Sambalpur-Baragarh-Orissa/Chhatisgarh Border section of NH-6 from km 0.00 to km 88.00 in the state of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III | Orissa | NHAI |
4 | Six laning of Dhankuni- Kharagpur Section of NH-6 from Km 17.600 to Km 129.000 in the state of West Bengal to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase V. | West Bengal | NHAI |
5 | Design, Engineering, Finance, Construction, Operation & Maintenance Chattisgarh / Maharashtra Border–Wainganga Bridge section from Km 405.000 to Km. 485.000 of NH-6 in the State of Maharashtra under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis | Maharashtra | NHAI |
6 | Design, Engineering, Finance, Construction, Operation & Maintenance of End of Durg Bypass - Chattisgarh / Maharashtra Border from Km 322.4 to Km. 405.000 of NH-6 under NHDP Phase IIIA on Build, Operate and Transfer (BOT) Basis | Chattisgarh | NHAI |
7 | Development of Jaora-Nayagaon section from km. 125.00 to 252.81 on SH-31 to 4-Lane section in the State of Madhya Pradesh on BOT Basis. | Madhya Pradesh | MPRDC |
Sr. No. | Name of Projects | State | Authority |
---|---|---|---|
1 | Construction of Chennai Outer Ring Road Phase II from Nemilicheri in NH-205 to Minjur in TPP road at Chennai in the state of Tamil Nadu on DBFOT Basis | Tamil Nadu | TNRDC |
2 | KSHIP-II Project WAP-2: “Design, Build, Finance Operate, Maintain and Transfer of Existing State Highway (SH 18) from Mudhol to Maharastra Border (Approx length 107.937 Kms) in the State of Karnataka on DBFOMT Annuity | Karnataka | KSHIP |
3 | Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Hungund – Muddebihal – Talikot in the state of Karnataka on DBFOMT Annuity Basis (WCP-7)” | Karnataka | KRDCL |
4 | Design, Build, Finance, Operate, Maintain and Transfer (DBFOMT) of Existing State Highway Bagewadi (NH-4) – Bailhongal – Saundatti in the state of Karnataka on DBFOMT Annuity Basis (WCP-1)” | Karnataka | KRDCL |
Sr. No. | On-going Projects | State | Authority |
---|---|---|---|
1 | 4/6 Laning of Kharar to Ludhiana Section of NH-95 (New NH-05) From Kharar KM. 10+185 (design chainage) To Samrala Chowk, Ludhiana KM 86+199 (design chainage) in the State of Punjab On Hybrid Annuity Mode. | Punjab | NHAI |
2 | Six-laning of Ranastalam-Anandpuram section of NH-16 from km 634.000 to km 681.000 in the State of Andhra Pradesh under NHDP Phase-V on Hybrid Annuity Mode. | Andhra Pradesh | NHAI |
3 | Six laning of Khairatunda - Barwa Adda of NH-2 from Km 360.000 to Km 400.132 section on Hybrid Annuity Mode in the State of Jharkhand under NHDP Phase-V. | Jharkhand | NHAI |
4 | Four Laning of Tumkur-Shivamogga Section from Km. 12+310 (Design Km. 12+300) to Km. 66+540 (Design Km. 65+195) from Mallasandra to Karadi Village of NH-206 under NHDP-Phase-IV on hybrid Annuity Mode, in the State Karnataka (Package-I) | Karnataka | NHAI |
5 | Four Laning of Tumkur - Shivamogga section from Km. 66+540 (Design Ch. 65+195) (Karadi) to Km. 119.970 (Design Ch. 121.900) (Banwara) of NH-206 under NHDP- PHASE-IV on HAM in the state of Karnataka (Package-II) | Karnataka | NHAI |
6 | 4 Lanning of Belgaum - Khanapur Section (Km 0+000 - Km 30+800) (Design Chainage Km 0+000 to Km 30.000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode. | Karnataka | NHAI |
7 | Construction of Eight Lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Ankleshwar to Manubar section of Vadodara Mumbai Expressway) in the state of Gujarat under NHDP Phase -VI on Hybrid Annuity mode. | Gujarat | NHAI |
8 | Four laning of Tumkur- Shivamogga section from Ch.170+415 km to Ch.226+750Km, Bettadahalli Shivamogga of NH-206 on Hybrid annuity mode under Bharatmala Pariyojna in the state of Karnataka (Package-IV). | Karnataka | NHAI |
9 | Four laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on HAM Mode | Telangana | NHAI |
10 | Four lanning of Tumkur - Shivamogga section from Km. 121+900 (Banwara) to Km. 170+415 (Bettadahalli) section of NH-206 in the state of Karnataka on Hybrid annuity mode under Bharatmala Pariyojana (Package-III). | Karnataka | NHAI |
11 | Development of 6-lane Greenfield Highway from Km 162.500 to Km 203.100 Baswantpur to Singnodi section (Package-IV of Akkalkot – KNT/TS Border) in the state of Karnataka | Karnataka | NHAI |
Sr. No. | BOT Completed Projects | State | Authority |
---|---|---|---|
1 | Improvements to Surat – Dhule Road (M.S.H. No. 7 ) from k.m. 527/400 to 553/000 including construction of diversion outside Dhule town (5.90 k.m.) in Dhule District. | Maharashtra | PWD |
2 | Four lanning and strengthening of Pune Ahmednagar Road, S. H. 60 KM 10/600 to 64/00 on B.O.T. basis.- | Maharashtra | PWD |
3 | Construction of R.O.B. with approaches near Nashirabad village at Km.415/800 of Dhule – Nagpur Road N.H.6 in lieu of level crossing at Railway Km.433/17-19 with strengthening to Km.414/00 to 419/00 of N.H.6 under B.O.T. Scheme (with toll rights)”. | Maharashtra | MORTH |
4 | Improvement To S.H 76 To Takali Kasegaon Anwali Road M.D.R 71 Km 0/000 T0 11/000 With Private Finance And Toll Rights On Build, Operate Transfer (BOT) Basis | Maharashtra | PWD |
5 | Development of Indore - Edlabad Road Project (SH-27). | Madhya Pradesh | MPRDC |
6 | Construction of Dewas Bye Pass under BOT basis. | Madhya Pradesh | PWD |
7 | Upgradation of Infrastructual Services and Enviormental Improvement at Nandanagar. | Madhya Pradesh | IMC |
8 | Improvement to Akola Mini Bypass Road including Bridge on Morna River (Km 1/600) in Akola District on B.O.T. Scheme. | Maharashtra | PWD |
9 | Four Lanning in km. 120/200 to 155/600 & Widening to three Lane in km. 155/600 of Ahmednagar – Aurangabad Road (SH – 60). | Maharashtra | PWD |
10 | Six Laning of Pimpalgaon-Nashik-Gonde Section of NH-3 from Km 380.00 to Km 440.00 in the state of Maharashtra under NHDP Phase III on DBFOT basis | Maharashtra | NHAI |
11 | Construction of Katni Bypass on NH-7 from Km 361/2 to 378/6 around Katni Town in Madhya Pradesh, India on BOT Basis. | Madhya Pradesh | MORTH |
12 | Construction of four lane access controlled Chittorgarh bye-pass road at Chittorgarh, Rajasthan. | NHAI, New Delhi | Rajasthan |
13 | Ankali Bridge | Maharashtra | PWD |
14 | Mandve Bridge | Maharashtra | PWD |
15 | Ahmednagar-Karmala | Maharashtra | PWD |
16 | Sheree Nalla (Krishna River Bridge) Sangali | Maharashtra | PWD |
17 | Foot Over bridge on Eastern Express Highway - NH - 3 | Maharashtra | PWD |