Road | Name of Project | Client | Location | Contract Value in Rs. Millions |
---|---|---|---|---|
Aroor to Thuravoor Thekku section of NH 66 | Construction of 6 lane Elevated Corridor along with development of existing 4 lane road at ground level from Aroor to Thuravoor Thekku section of NH 66 (from Km. 366+330 to Km.379+082 of NH-66) (Length 12.752 Km) | National Highway Authority of India | Kerala | 16,685.00 Excl GST |
Belgaum to Sankeshwar bypass | Construction of 6 laning from Belgaum to Sankeshwar bypass from km 515+000 to km 555+017 of NH-48 in the state of Karnataka on EPC mode under Bharatmala pariyojana. | National Highways Authority of India | Karnataka | 8,294.90 |
Link Road NH-166 S to Mopa Airport | Construction of link road (NH-166 S) with paved shoulder configuration to MOPA airport in the state of Goa | MoRTH | Mopa Airport, Goa | 7,691 |
Ambala Kharar | Development of Memmadpur (Ambala) – Banur (IT City Chowk) –Kharar (Chandigarh) Corridor under Bharatmala Pariyojana – Package-II – 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length: 31.23 Km) in the state of Punjab on EPC mode | National Highways Authority of India | Punjab | 7,260 |
NH-319(old NH-30) | Four laning of Pararia to Mohania section of NH-319(Oid NH-30) from Km 54+530 to Km 115+330 (Design Chainage) under Bharatmala Parlyojana Phase-I on EPC Mode (Package II) | National Highways Authority of India | Bihar | 6,900 |
NH-29 | Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 113+300 to Km 146+230 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village – Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode under NH(O)-NE | National Highways & Infrastructure Development Corporation Ltd | Assam | 2,821 |
Panagarh Palsit | Six Laning of National Corridor NH 19 from Panagarh to Palsit from Km. 521+120 to Km. 588+870 (Total Design Length 67.750 Km) in the state of West Bengal under Bharatmala Pariyojana Civil & Associated works on EPC basis | Adani Road Transport Limited | West Bengal | 15,674.50 Incl. GST |
Khammam Cable stayed bridge | Construction of Bridge comprising 300 mts Cable Stayed Bridge and 390 mts Viaduct with Box type Super Structure and its approaches at km. 57/150 – Km. 58/400 on Suryapet - Aswaraopet road in Khammam town limits in the State of Telangana on EPC Mode” with Road Development & Building Department, Government of Telangana. | Road Development & Buildings Dept., Govt. of Telangana | Telangana | 1,460 |
CIDCO – NMIA BRIDGE | Design and Construction of Stilt Bridge SBR - 9 for Eastern Connectivity for Navi Mumbai International Airport (NMIA) Project, Navi Mumbai | CIDCO | Maharashtra | 6,225.55 |
NH-2 | Six Laning Of Aurangabad to Bihar - Jharkhand Border (Chordaha), Section of NH-2 From Km. 180+000 To Km. 209+827 (Pkg-I) in the State of Bihar under Bharatmala on EPC Mode | National Highways Authority of India | Bihar - Jharkhand Border | 5,200 |
Road | Name of Project | Client | Location | Contract Value in Rs.Millions | Completion Date |
---|---|---|---|---|---|
Improvement and Maintenance of East Coast Road (22/3 to 135/500 Km.) in Tamilnadu. |
TNRDC, Chennai | Tamil Nadu | 416 | Dec-01 | |
NH-4 | Westerly Bypass | NHAI, New Delhi | Maharashtra | 1,413 | Jul-03 |
SMC | Concrete road within Surat City limits (Pkg I & II) | Surat Municipal Corporation | Gujarat | 472 | Jun-07 |
LBS | Widening of construction of Lal Bahadur Shastri Marg (LBS) from Sion to Kanjurmarg and Kanjurmarg to Mulund Check Naka - Package- 1 and Package-il. | MMRDA | Maharashtra | 437 | 31.03.2008 |
NH-222 | Rehabilitation and Upgradation of Ane-Ghat to start of Ahmednagar bypass section [km. 161/570 to km 211/000] of NH-222 | MORT & H thru PWD, Maharashtra | Maharashtra | 1,258 | 25.07.2016 |
NH No. NE II | Development, Construction and Maintenance of Six Lane Eastern Peripheral Expressway (NH No. NE-II)-Package IV from km. 71.000 to km. 93.000 | National Highway Authority of India | Uttar Pradesh | 7,890 | 26.05.2018 |
NH-222 | Rehabilitation and Up gradation of NH-222 from end of Malshej Ghat to start of Ane Ghat section [km. 101/000 to km 161/570] | MORT & H thru PWD, Maharashtra | Maharashtra | 1,662 | 24.07.2018 |
NH-513 | 2 laning of Pasighat – Mariyang – Yingkiang road (Now NH-513) from Singer river to Sijon River section from 19.880 km to 43.257 Km. (Length- 23.377 Km.) | National Highways & Infrastructure Development Corporation Ltd | Arunachal Pradesh | 1,790 | 07.07.2019 |
NH-234 | Rehabilitation and Upgrading to 2 lanes/2 lane with Paved Shoulders Configuration and Strengthening of Madhugiri-Chikkaballapura-Mulbagal Section from Km 343.800 to Km 483.151 of NH-234 | NHAI | Karnataka | 2,194 | 10.11.2019 |
NH-52 | 2 laning with Paved Shoulder of NH-52 From KM 583.450 to Km 605.600 (Existing Chainage from Km 583.450 to km. 595.00) From Pasighat to Bomjur Road | National Highways & Infrastructure Development Corporation Ltd | Arunachal Pradesh | 1,550 | 10.08.2020 |
NH-4B | Construction of NH-4B from km. 21.200 to Km 27.270 (D to E Section) and from Km. 0.000 to Km. 4.492 (D to G section) of JNPT Phase – II (Package – IV) on EPC basis. | MJPRCL A SPV of National Highways Authority of India |
Maharashtra | 4,140 | 30.11.2020 |
NH 753J | Up-gradation of Bhadgaon – Chalisgaon (section II)of NH 753J (46.800 Km) from Design chainage 56+200 Km to 103+000 Km to Two lane with paved shoulder | NH PWD, MAH | Maharashtra | 2,102 | 20.12.2020 |
NH 753J | Up-gradation of Jalgaon – Bhadgaon ( section I,)of NH 753J from chainage 4+000 Km to 56+200,Km to Two lane with paved shoulders/ Four Lane,configuration of Jalgaon – Bhadgaon –,Chalisgaon –Nandgaon- Manmad-NH 753J (52.200 Km )] | NH PWD, MAH | Maharashtra | 2,373 | 20.01.2021 |
NH-31 | Development of 4-lane Islampur Bypass of 10.31 km length from km. 0.000 (Ex. Ch. Km 498.500) to Km 10.310 (Ex. Ch. Km 506.950) on NH-31 | National Highway Authority of India | West Bengal | 2,770 | 26.02.2021 |
NH-32 | Two/Four lanning with paved shoulders of Govindpur (Rajgunj)-Chas- West Bengal Border section of NH-32 from km. 0.000 to Km. 56.889 in the State of Jharkhand on NHDP Phase-IV on EPC mode | National Highways Authority of India | Jharkhand | 4,860 | 30.04.2022 |
Bundelkhand Expressway Project (“Package-Ill) | Uttar Pradesh Expressways Industrial Development Authority (“UPEIDA”) in respect of the Project viz. Development of Bundelkhand Expressway Project (“Package-Ill”): From Kaohari (Dist. Mahoba) to BaroliKharka (Dist. Hamirpur) (Km 100+000 to Km 149+000 on EPC Mode | Uttar Pradesh Expressway Industrial Development Authority (UPEIDA) | Uttar Pradesh | 10,795.20 | 28.07.2022 |
NH-319 (old NH-30) | Four laning of Arrah to Pararia section of NH-319(old NH-30) from Km 0+000 to Km 54+530 (Design Chainage) under Bharatmala Pariyojana Phase -1 on EPC Mode (Package-I) | National Highways Authority of India | Bihar | 7,000 | 30.01.2023 |
Road | Name of Project | Client | Location | Contract Value in Rs.Millions | Completion Date |
---|---|---|---|---|---|
Construction, Rehabilitation and two laning with Paved Shoulders of Dumka-Hansdiha Road | State Highways Authority of Jharkhand | Jharkhand | 2,114 | 30.04.2019 | |
Construction, Rehabilitation and two laning with Paved Shoulders of Govindpur-Tundi-Giridih Road | State Highways Authority of Jharkhand | Jharkhand | 1,901 | 05.11.2020 | |
Link 21 E & 21 F | Up gradation of Road from Badami Bypass junction (Km2+870) to Pattadakallu (Km 21+530) in link 21E and Pattadakallu (Km 0+000) to Kamatagi (Km 22+282) link 21F including additional length for Badami bypass (2.190 kms) in link 21E in the state of Karnataka | Karnataka State Highways Improvement Project | Karnataka | 1,100 | 23.06.2017 |
BRTS Bhopal – construction of Pilot corridor 16.05 Km. (Misrod to bairagarh) for BRTS Project Bhopal under JNNURM | Bhopal Municipal Corporation | Madhaya Pradesh | 1,319 | 26.06.2014 | |
Phalodi – Pachpadra road | Road Infrastructure Development Company of Rajasthan Limited (“RIDCOR”) | Rajasthan | 1,620 | Apr-07 |
Road | Name of Project | Client | Location | Contract Value in Rs.Millions |
---|---|---|---|---|
“Improvement of Baraiyerhat-Heanko-Ramgarh Road (R-151 & R-152) (Ch: 0+000-38+000) by Widening & Reconstruction of Existing Pavement (5.50m), Widening of Existing Pavement (2 x 0.90m), Earthwork on Road Embankment, Surfacing (Dense Bituminous Surfacing), Construction of Hard Shoulder, Construction of Rigid Pavement (10.30m), Construction of Road Median, Construction of RCC Box Culvert (23 nos), Construction of PC Girder Bridge (9 nos.), CC Block Placing, Construction of Toe wall, Construction of RCC Retaining Wall, MS Pipe Palasiding, Construction of RCC Saucer Drain, Construction of RCC U-Drain, Sign Signal, KM Post, Road Marking, Electronic Directional Sign (Solar Power), General & site facilities etc. under Chattograrn Road Division during the year 2021-2022” | RTHD, MoRTB, Govt. of Bangladesh | Bangladesh | 6,837 | |
ROAD – East Bank – East Coast Road Linkage Project | East Bank – East Coast Road Linkage Project (Ogle to Haags Bosch, Eccles) | Co-operative Republic of Guyana, Ministry of Public Works | Guyana (South America) | 8,471.86 |
Road | Name of Project | Client | Location | Contract Value in Rs.Millions | Completion Date |
---|---|---|---|---|---|
The Development of Road Network for Hulhumale Phase 2 | Housing Development Corporation | Maldives | 2,690 | 03.05.2018 |