RAILWAY OVER BRIDGE IN 100 WORKING DAYS

The Company has added yet another feather in its cap by constructing a Railway Over Bridge in just 100 working days at the prestigious Eastern Peripheral Expressway Project.

One can judge the importance of this achievement by considering the fact that in general, construction of such ROB  takes 2 to 2.5 years.

The EPE project is one of the most important highway projects being executed in the Country as it is intended to reduce congestion and pollution in Delhi.

This project comes as an effect of Supreme Courts direction to create a bypass around Delhi. The progress of the project is being monitored directly by the Prime Minister’s office.

BRIDGE (1) ON RIVER Rupnarayan

This bridge was special because for over 10 years, no construction company came forward to build it. The previous company that had tried to failed to do so and abandoned the project midway.

Ashoka Buildcon rose to the challenge. Faced with a dual challenge, that of the geographical impediments and of rectifying the errors made by the previous construction company, Ashoka deployed the best of its resources to complete the bridge. 

The Company built this bridge an nontraditional method, that of launching a 323 mts. long, 1700 tonne heavy,  steel girder assembly from one end of the river and finally lowering it into position. Such a feat had never been tried before in India.

Braving all odds, the team members of Ashoka worked days and nights to complete this one of its kind bridge in a period that was way ahead of its scheduled completion date.  

BRIDGE (2) ON RIVER Rupnarayan

This Bridge was constructed parallel to the other bridge constructed across the same river. Ashoka Buildcon built this bridge using the segmental launching method.

This method although commonly used in constructing fly overs, was deployed for the first time in India for construction of a river bridge. The perennial river  with water level rising and dropping abruptly and unpredictable river bed conditions, made project execution a huge challenge. Heavy monsoons and weather turbulence added further to the difficulties faced by the project execution team.

Despite the fact that the time allotted to complete the two bridges was 30 months, Ashoka Buildcon built them in an impressive time period of 12 months.

A Bridge in 38 Days

In the year 1999, Ashoka created a stir in bridge construction industry with the construction of Mandve Bridge near Pandharpur (Maharashtra).

The allotted time period for the construction of this 90 mts. cast in situ bridge was 12 months.

In what can be termed as an extra ordinary example of team work, planning and execution, this bridge was completed in 38 days.

The feat earned a place in the Limca Book of Records.

Awards

Ashoka Buildcon Ltd  Awarded for “ Innovations in CSR Practices ” by ET Now Presents CSR Leadership Awards -2018.

Ashoka Buildcon Ltd has been felicitated once again by Bihar Electricity Board for “Outstanding Performance” in Project Execution.

Ashoka Buildcon Ltd Awarded as “ Infrastructure Company Of the Year ” by D & B Awards- 2017

Mr. Sanjay Londhe, CEO & Director of Ashoka Buildcon Ltd has been Awarded as “ CEO of The Year ” by Construction Times Award 2017

Ashoka Buildcon Ltd’s Munger Power project has been Awarded as “ Best Executed Power Project” by Construction Times Award 2017

Medium category from Rajesh Dahiya, Group Head, Apollo Tyres; and Pravin Darade, Additional Metropolitan Commissioner, Mumbai Metropolitan Region Development Authority and Secretary to Chief Minister, Government of Maharashtra, at the 15th CONSTRUCTION WORLD Annual Awards presented by Apollo

Ashoka Buildcon Limited, was honored during the ‘CIDC Vishwakarma Award -2017’ and has been awarded for ‘ Best Professionally Managed Company

Mr. Ashok Katariya, Chairman- Ashoka Buildcon Ltd. has been honoured with the Business Leadership Award for Infrastrucutre sector by Indian Achievers Forum

Mr.Ashoka Buildcon Ltd. has been honoured as Infra Company of The Year at the EPC World Awards

Power Division of Ashoka Buildcon Ltd. has been honoured with the Appreciation Award by Bihar Govt. for Excellecne in Project Execution at Munger

Mr. Paresh Mehta, CFO -Ashoka Buildcon Ltd. has been honoured as one of the MOST INFLUENTIAL CFO’s OF INDIA by CIMA ( Chartered Institute of Management Accountants )

Ashoka Buildcon Limited, was honored during the Worldwide Achievers Awards – 2014 and has been awarded for Best Construction Company of The Year

Ashoka Buildcon Limited, was honoured during the EPC World National Level Awards 2012 and has been awarded for Outstanding Contribution in Roads and Highways

Ashoka Buildcon Ltd. Bags two awards at the Construction Week National Awards- 2014 . Road Contractor of the Year & Roads and Highways Project of the Year (Runner up)

Construction Sphere – a prominent construction related Media House has awarded Ashoka as Finalist in the following Categories Developer of The Year – Ashoka Concessions Ltd ,Contractor of The Year – Ashoka Buildcon Ltd

Ashoka Buildcon Limited, was honored during the Worldwide Achievers Awards – 2014 and has been awarded for Best Construction Company of The Year

Ashoka Buildcon Limited, was honoured during the EPC World National Level Awards 2012 and has been awarded for Outstanding Contribution in Roads and Highways

Ashoka Buildcon Limited, was honoured during the Construction Week Awards – 2013 and has been awarded for Infrastructure Company of The Year – 2013

The Federation of Engineering Institutions of Asia and the Pacific (FEIAP) has awarded Mr Sanjay Londhe,Director & CEO Projects, Ashoka Buildcon Ltd as ‘Engineer of the Year 2014’ at an event in Beijing

Ashoka has been Awarded for Excellence in Infrastructure – Roads & Highways